Skip to content
  • +1 213-214-2203
  • sales@typhonmachinery.com
  • 2522 S Malt Ave. Commerce, CA 90040 United States
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
  • News & Media
#image_title

Steel cladding decided on for St Magnus Space revamp

Machexpert by Machexpert
February 19, 2026
Home Construction
Share on FacebookShare on Twitter


St Magnus House will be renamed Fresh Wharf after the refurbishment
St Magnus Space will probably be renamed Contemporary Wharf after the refurbishment

Reynaers Aluminium UK is crediting the environmental credentials and design flexibility of its ConceptWall 50 (CW 50) curtain walling device for its variety for the St Magnus Space refurbishment.

St Magnus Home is an 11-storey administrative center block at the north financial institution of the River Thames at 3 Decrease Thames Side road. Designed via Richard Seifert and finished in 1984, it’s now being refurbished via Mace Assemble for Pegasi Control Corporate to deliver it as much as fashionable functionality requirements.

CW 50 curtain walling from Reynaers Aluminium UK used to be selected to exchange the present brutalist cement façade.

Running with architect Buckley Gray Yeoman (BYG), Mace selected Reynaers provider Century Facades, which appointed Aluminium & Glass Facades (AGF) to assist with the construction revamp. As a part of the face elevate, the construction will probably be renamed Contemporary Wharf.

John McComb, technical director at Reynaers Aluminium UK, mentioned: “The problem with this retrofit mission used to be sourcing merchandise that won’t most effective strengthen the cultured of the construction however too can ship low-carbon and effort environment friendly functionality. The goals had been extraordinarily difficult, and those had been met with our low-carbon providing.

“Reynaers low carbon aluminium CW 50 curtain walling has been specified for its stand-out mixture of excessive functionality and recyclability, in addition to compatibility with inexperienced applied sciences. It used to be evolved for simple fabrication and set up, decreasing complexity, mission time, and minimising the full carbon footprint.”

He added: “The CW 50 is the perfect selection for taking advantage of the site of the mission, with its slender 50mm width and talent to fortify glass as much as 700kg. The device delivers unobstructed perspectives and maximises herbal mild, opening up the façade to the river, giving panoramic perspectives of the South Financial institution, Tower Bridge and the Shard.”

Century Facades managing director Tim Lovell mentioned: “The usage of Reynaers low carbon aluminium is integral to the reinvention of St Magnus Space for instance of round design rules. Changing the monolithic cement facade with Reynaers’ CW 50 complements the modernity of the construction whilst minimising its environmental affect.

“Running intently with the architect to fulfill the design specification, Aluminium & Glass Facades, in partnership with ourselves has been in a position to depend on Reynaers as a depended on spouse to make sure the mixing of design and sustainability are totally realised. As soon as finished, the high-performance facade will proceed to scale back power intake and decrease carbon emissions, decreasing the construction’s environmental affect long-term.”

Were given a tale? E mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

Luxurious Residing Meets Membership Way of life in Sarasota Partnership
Construction

Luxurious Residing Meets Membership Way of life in Sarasota Partnership

April 15, 2026
Virtual Builder Ep 139: Why Development Wishes a New Roughly Management
Construction

Virtual Builder Ep 139: Why Development Wishes a New Roughly Management

April 15, 2026
Integrating GreenPro Metal in Subsequent-Gen Inexperienced Constructions
Construction

Integrating GreenPro Metal in Subsequent-Gen Inexperienced Constructions

April 14, 2026
Developer fined £40,000 after destroying bat roosts
Construction

Developer fined £40,000 after destroying bat roosts

April 13, 2026
Next Post

KPPC Complex Chemical substances Breaks Floor On Plant

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Machinery Asia is an online portal focused on the construction and heavy equipment industry. It publishes up-to-date news, product updates, and articles about construction machinery, project management, mini excavators, skid steers, and other heavy equipment topics to help professionals and enthusiasts stay informed about industry trends and developments.

Categories

  • 2 Ton Mini Excavator
  • 2.5 Ton Mini Excavator
  • 3 ton mini excavator
  • Attachments
  • Compact Equipment

ADDITIONAL LINKS

  • HOME
  • News & Media
  • SHOP
  • Information Depot
  • Mini Excavator

©2026. Machineryasia.info. All Rights Reserved.

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
  • News & Media

© 2026 All rights reserved by machineryasia.info