fairfaxcounty.gov picture
Even though development is not going to start till 2027 on Northern Virginia’s $937 million Richmond Freeway Bus Fast Transit (BRT) mega mission, the hassle is already making important development, Fairfax County officers mentioned on Sept. 9.
The county’s Division of Transportation (FCDOT) won approval previous this summer time from the Federal Transit Management (FTA) to start the mission’s engineering segment, marking a significant design milestone that can lead without delay to ultimate design and development.
The 7.4-mile BRT device, named “The One,” is meant to revitalize the Richmond Freeway/U.S. Freeway 1 hall with a devoted bus lane and combined site visitors.
9 new transit station spaces between the Huntington Metro station close to Alexandria and the Citadel Belvoir Army Reservation to the southwest are also integrated inside the BRT mission, together with pedestrian and bicycle amenities, and protection improvements.
FCDOT’s goal is to reinforce transit frequency and reliability, in addition to scale back site visitors congestion and strengthen financial enlargement within the southeastern portion of the county close to the Potomac River.
The present transit provider within the hall does now not meet the wishes of present or long term citizens, in line with FCDOT, with demanding situations comparable to lengthy go back and forth occasions, rare provider, and delays all through rush hour. The brand new BRT device is predicted to reinforce transit frequency, reliability, convenience and beauty.
“This milestone approval propels us in opposition to a transformative technology in Fairfax County’s transportation panorama,” mentioned Jeffrey McKay, chair of the Fairfax County board of supervisors. “The Richmond Freeway BRT mission is not only about improving transit; it is about fostering financial enlargement; bettering the standard of existence for our citizens; and development a sustainable long term. As we transfer into the engineering segment, we reaffirm our determination to making a contemporary, environment friendly, and dependable transit device that meets the evolving wishes of our colourful group.”
If all is going neatly with the development, FCDOT plans to have the BRT totally operational by way of 2031.
The FTA approval aligns with Embark Richmond Freeway, a Fairfax County mission designed to reinforce the Richmond Freeway house with higher transportation choices and financial enlargement. The county is operating with the Virginia Division of Transportation (VDOT) to widen the freeway to incorporate extra lanes and amenities for pedestrians and cyclists.
Recommended by way of the county board of supervisors in 2015, the brand new BRT device was once all the time noticed as a key a part of the plan. The enhancements will strengthen federal investments, together with upgrades to Citadel Belvoir.
Now, engineers operating at the BRT mega mission can start detailed making plans and design, FCDOT famous, in addition to safe further investment and get ready for its development.
HRT Transit Stations to Reinforce Space’s Construction
Moreover, every of Fairfax County’s HRT transit stations will strengthen compact, medium-density, mixed-use and pedestrian-oriented redevelopment efforts, sometimes called transit-oriented building (TOD), in line with Holland & Knight, a legislation apply that has land-use groups centered at the Richmond Freeway hall.
The company famous that the brand new city nodes are designed to catalyze good enlargement and financial building alongside Richmond Freeway, remodeling the auto-dominated freeway into distinct new districts which are transit-oriented, pedestrian-friendly, and mixed-use. Moreover, the BRT will pave the best way for a proposed long term Metro extension from Huntington Station to Hybla Valley.
Given the just about $1 billion long term funding, some great benefits of being designated as a business revitalization district, together with the present value of land, makes the Richmond Freeway hall a first-rate house for redevelopment.
And, with the hall already serving as a connection between Citadel Belvoir, Fairfax County’s greatest employer, and Amazon HQ2/Washington, D.C., each the freeway and the brand new transit infrastructure are more likely to additional bolster further enhancements to the world.
All the way through his time operating for Fairfax County, Holland & Knight’s Washington D.C. and Northern Virginia Land Use Planner Anthony DeLorenzo served because the lead city clothier for the HRT mission, the place he oversaw the improvement of city ideas that remodeled present land use and transportation stipulations into distinct multimodal transit-oriented districts.