Subcontractors of Components Europe will most effective obtain a fragment of the £8.7m they had been owed when the modular development corporate entered management closing June.
A development file through Interpath joint directors Samuel Birchall and Stephen Absolom confirmed that they have got secured simply over £5m from the sale of corporate property.
This general integrated £2.5m from Components’ financial institution accounts and £1.5m from the sale of its Camp Hill mission inventory and modules to CMC Amenities Control.
GS Actual Property Construction London bought the company’s contract to construct a 23-storey resort and place of work advanced in east London, the place Components used to be the primary contractor, for £100,000.
After paying £3.6m to the directors for his or her services and products and £600,000 to preferential collectors – together with staff and HMRC – most effective £1.4m will stay for unsecured collectors reminiscent of supply-chain subcontractors.
On the time of its cave in, Components Europe owed £8.7m to greater than 200 providers.
The collapsed contractor’s remark of affairs additionally confirmed a £13.6m debt to “different collectors” and £71.8m in shareholder loans, Interpath stated.
Extra price range could also be added as soon as the corporate recovers quantities owed through borrowers, pre‑bills and retention reserves, estimated at £11.4m within the remark of affairs.
All 217 team of workers individuals were made redundant, together with the nineteen staff who had been retained to help the directors.
Former staff have lodged tribunal claims over the loss of session on their redundancies.
The employment tribunal listening to is anticipated in April 2026, and then any protecting awards shall be drawn from the atypical preferential collectors’ pot.
In response to present estimates, the directors stated they be expecting staff and HMRC secondary preferential collectors to obtain all of the cash they’re owed.
“We look forward to that unsecured collectors will obtain a dividend, paid right through the collectors’ voluntary liquidation,” Birchall and Absolom added.
“The timing and quantum of the distribution is lately unsure.”
Components Europe filed for management in June after it suffered losses of £80.6m during the last 3 years, because of value overruns and water ingress defects on its tasks.
The Telford-based corporate used to be based in 2005 through the Pickstock Team.
It specialized in modular and toilet pod answers for the residential, resort, scholar lodging and healthcare sectors.
In 2020, South Korean development large GS Engineering & Development was the bulk proprietor.
Ahead of it collapsed, Components Europe acted as major contractor for 2 tasks in east London and Birmingham.
The company posted a pre-tax lack of £29.5m from turnover of £42m in its most up-to-date annual accounts for the yr to 31 December 2023.






