Friday, November 21, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Sizewell C to reuse 15,000 tonnes of recycled concrete from Sizewell A

Machexpert by Machexpert
November 21, 2025
Home Construction
Share on FacebookShare on Twitter


 Drone shot of aggregate piles following the demolition of concrete plinths within Sizewell A's turbine hall [Photo from NRS]
Drone shot of mixture piles following the demolition of concrete plinths inside Sizewell A’s turbine corridor [Photo from NRS]

Contractors construction the Sizewell C nuclear energy station in Suffolk are set to reuse greater than 15,000 tonnes of recycled concrete from the turbine alternator plinths on the now defunct Sizewell A plant.

The turbine corridor at Sizewell A has been demolished as a part of the web site’s ongoing decommissioning, led via Nuclear Recovery Services and products (NRS).

All recycled fabrics were examined and transported only some hundred metres up the coast to Sizewell C’s major development space (MCA), the place they’re being repurposed as sub-bases for quite a lot of basis platforms.

The initiative saves cash in addition to carbon.

Sizewell C web site supply director Damian Leydon stated: “By means of reusing this subject material, we’re lowering the choice of vehicles transporting mixture thru East Suffolk, whilst additional reaffirming our dedication of minimising our environmental affect throughout development. That is nice information all spherical.”

Related Information

NRS senior undertaking supervisor Wendy Heath stated: “This leading edge way has averted 28 tonnes of CO₂ emissions via diverting waste from landfill, finishing the round financial system for this subject material. This marks a first-of-its-kind success for NRS and showcases how collaborative running is enabling sustainable decommissioning. By means of lowering waste and minimising site visitors on native roads, we’re actively supporting the way forward for blank power.”

The speculation got here from the Atmosphere Company and the native council, whose officers approached the Sizewell C undertaking staff with the chance to repurpose subject material that will differently be handled as waste.

Since September, Sizewell A has been wearing out the crushing, checking out, and certification of the concrete to make sure it meets the WRAP (Waste & Sources Motion Programme) high quality protocol. As soon as qualified, the fabric has then been transported to the Sizewell C web site as recycled mixture. Transfers are actually whole.

Sally Coble, nuclear legislation staff supervisor south on the Atmosphere Company, stated: “It is a nice instance of the Atmosphere Company’s enabling method to legislation. We labored with Nuclear Recovery Services and products (NRS) and Sizewell C to facilitate the reuse of the Sizewell A turbine corridor demolition waste. Reusing the beaten concrete as mixture at Sizewell C is a sustainable method to nuclear web site decommissioning. We’re proceeding to steer NRS to make sure this way is used, the place conceivable, in any respect decommissioning websites.”

Councillor Tom Daly, East Suffolk Council cupboard member for power and local weather alternate, added: “I’m happy that subject material from the decommissioned Sizewell An influence station is being reused for Sizewell C. It’s necessary that each and every effort be made to minimise the affect of development at the setting and local people.”

Were given a tale? E-mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

Inexperienced gentle £100m Digbeth regeneration scheme
Construction

Inexperienced gentle £100m Digbeth regeneration scheme

November 21, 2025
Executive takes stake in housing JV
Construction

Executive takes stake in housing JV

November 21, 2025
Housing stats display goal disappearing
Construction

Housing stats display goal disappearing

November 21, 2025
JLG Wins CES Award for Robot Articulated Growth Elevate
Construction

JLG Wins CES Award for Robot Articulated Growth Elevate

November 21, 2025
Next Post
Executive takes stake in housing JV

Executive takes stake in housing JV

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Keeping up Heavy Haul Trailers (What You Want To Know)

March 9, 2024
Subsequent-gen insulation and its have an effect on at the constructed trade

Subsequent-gen insulation and its have an effect on at the constructed trade

July 13, 2025

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Inexperienced gentle £100m Digbeth regeneration scheme
  • Executive takes stake in housing JV
  • Sizewell C to reuse 15,000 tonnes of recycled concrete from Sizewell A

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info