Thursday, December 4, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Tutor Perini unit lands $60M dam rehab undertaking

asianlzw by asianlzw
September 5, 2025
Home Construction
Share on FacebookShare on Twitter


This audio is auto-generated. Please tell us when you have comments.

Award: Dam modernization undertaking
Worth: $60.2 million contract worth, general undertaking price $84 million
Location: Rothschild, Wisconsin
Consumer: Forestry merchandise corporate Domtar

Tutor Perini subsidiary Lunda Development has landed a $60.2 million contract to replace a bit of a 113-year-old dam in Rothschild, Wisconsin. 

The scope of the Rothschild Dam Modernization undertaking comprises changing an out of date, 276-foot lengthy trees dam with a concrete dam that includes cofferdams for river diversion, in keeping with a Tutor Perini information liberate. 

The unique dam used to be in-built 1912 to energy the Rothschild Mill and channel pulp wooden from upstream. Its building, which spanned 663 ft around the Wisconsin River, created Lake Wausau, in keeping with a undertaking web page from Montreal-based forestry merchandise corporate Domtar, the dam’s proprietor. The corporate tasks its general price for the undertaking to be $84 million. 

The task additionally comprises:

  • Demolition of the prevailing timer dam construction. 
  • Set up of deep foundations for structural beef up. 
  • Placement of bolstered concrete.
  • Development of a brand new keep an eye on construction.
  • Set up of a prefabricated bridge.
  • Set up of recent dam gates. 

The trees segment of the dam used to be remaining changed in 1964, in keeping with Domtar, with the Rothschild Mill making an investment $12 million in repairs and upkeep since then. However periodic upkeep were deemed not enough according to the Federal Power Regulatory Fee. The dam lately supplies not up to 10% of the mill’s general power wishes. 

Lunda’s undertaking win comes as ageing dams around the U.S. have gained higher scrutiny lately. A 2023 document from the Affiliation of Dam Protection Officers discovered that it will price just about $158 billion to rehabilitate the country’s 88,616 poor, non-federal dams. Of that quantity, greater than $34 billion could be had to remediate essentially the most vital constructions. 

In the meantime, dam disasters in Michigan and at California’s Oroville Spillway have underscored the results of deferred repairs. 

Lunda started paintings at the Rothschild Dam Modernization undertaking in July, and anticipates considerable crowning glory by means of early 2029


author avatar
asianlzw
See Full Bio
asianlzw

asianlzw

Related Posts

Cross-ahead for Bam’s £140m Cardiff station improve
Construction

Cross-ahead for Bam’s £140m Cardiff station improve

December 4, 2025
Power grid paintings price £28bn over subsequent 5 years
Construction

Power grid paintings price £28bn over subsequent 5 years

December 4, 2025
Suffolk touts its 2025 contech startup alternatives
Construction

Suffolk touts its 2025 contech startup alternatives

December 4, 2025
Wates appointment within the west
Construction

Wates appointment within the west

December 3, 2025
Next Post
Diary dates: highlights of the CIOB calendar for the approaching month

Diary dates: highlights of the CIOB calendar for the approaching month

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Best Guidelines For Hiring The Proper Heavy Haul Trucking Services and products Supplier

Best Guidelines For Hiring The Proper Heavy Haul Trucking Services and products Supplier

August 7, 2024
Gould joins Bowdoin Development as challenge supervisor : NEREJ

Gould joins Bowdoin Development as challenge supervisor : NEREJ

January 24, 2025

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Cross-ahead for Bam’s £140m Cardiff station improve
  • Power grid paintings price £28bn over subsequent 5 years
  • Suffolk touts its 2025 contech startup alternatives

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info