Friday, November 14, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Scottish Energy awards £5.4bn in transmission and substation works throughout two frameworks

asianlzw by asianlzw
August 24, 2025
Home Construction
Share on FacebookShare on Twitter


Scottish Energy Transmission has awarded two strategic frameworks price a blended £5.4bn for works to amplify its onshore electrical energy infrastructure throughout central and southern Scotland.

The substation and overhead line contracts will toughen Scottish Energy’s Holistic Community Design programme, which targets to boost up grid capability to fulfill rising power call for and attach renewable era.

Each agreements run for 5 years, with choices to increase to ten years.

A £2.4bn strategic settlement for substation works covers engineering, design, and building throughout 5 quite a bit. Contractors will ship civil and electric works thru a mixture of aggregated and disaggregated fashions.

Framework companions might be appointed to person tasks the usage of NEC4 contracts, however Scottish Energy made no ensure of quantity or worth of labor in its contract award realize.

Concurrently, the buyer awarded puts on its £3bn overhead traces framework, cut up into 3 quite a bit.

It contains the design and building of 132kV, 275kV and 400kV overhead traces.

The frameworks will even toughen baseline upgrades beneath the RIIO-T2 and RIIO-T3 regulatory sessions, and might lengthen to buyer connection works.

Tasks stay matter to making plans and land consent.

Contractor appointments through lot

Substation Works Framework

Lot one: Substation Civil Enabling Works (£700m)

  • Adman Civil Tasks
  • George Leslie
  • & H. Brown
  • Luddon Development
  • Morgan Sindall Development & Infrastructure
  • Northstone (NI)
  • J. McLeod

Lot two: Substation Development Works (£750m)

  • Aureos Power
  • Kirby Team Engineering (UK)
  • Linxon UK
  • Morgan Sindall Development & Infrastructure
  • Siemens Power
  • UK Grid Answers

Lot 3: Substation Enabling Works (£385m)

  • Adman Civil Tasks
  • Amalgamated Development
  • George Leslie
  • & H. Brown
  • Luddon Development
  • Morgan Sindall Development & Infrastructure
  • J. McLeod

Lot 4: Substation Civil Works (£330m)

  • Adman Civil Tasks
  • Amalgamated Development
  • George Leslie
  • & H. Brown
  • Luddon Development
  • Morgan Sindall Development & Infrastructure
  • J. McLeod

Lot 5: Substation Electric Works (£235m)

  • Aureos Power
  • Kirby Team Engineering
  • Linxon UK
  • M Team Power (Community Infrastructure)
  • Painhas (Portugal)

Overhead Line Works Framework

Lot one: 400kV Overhead Line Works – HTLS (£600m)

  • Balfour Beatty Application Answers
  • M Team Power (Community Infrastructure)
  • Morgan Sindall Development & Infrastructure

Lot two: 275kV and 400kV Overhead Line Works (£1.875bn)

  • Aureos Power
  • Balfour Beatty Application Answers
  • M Team Power (Community Infrastructure)
  • Morgan Sindall Development & Infrastructure
  • Painhas (Portugal)
  • Picket Transmission and Distribution

Lot 3: 132kV Overhead Line Works (£525m)

  • Aureos Power
  • Balfour Beatty Application Answers
  • Cobra Instalaciones y Servicios (Spain)
  • M Team Power (Community Infrastructure)
  • Morgan Sindall Development & Infrastructure
  • Painhas (Portugal)
  • Energy Traces, Pipes and Cables
  • Picket Transmission and Distribution

Supply: Gov.united kingdom Discover a Gentle


author avatar
asianlzw
See Full Bio
asianlzw

asianlzw

Related Posts

FGIA Problems New Spec for Window Opening Regulate Gadgets
Construction

FGIA Problems New Spec for Window Opening Regulate Gadgets

November 14, 2025
Morgan Sindall begins £29m Appleby Grammar challenge
Construction

Morgan Sindall begins £29m Appleby Grammar challenge

November 14, 2025
Plant-hire affiliation invests in simulator
Construction

Plant-hire affiliation invests in simulator

November 14, 2025
First 80-tonne Sany excavator delivered
Construction

First 80-tonne Sany excavator delivered

November 14, 2025
Next Post
Inexperienced Development Developments for 2025: How Metal is Revolutionizing Eco-Pleasant Building

Inexperienced Development Developments for 2025: How Metal is Revolutionizing Eco-Pleasant Building

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Decline in development insolvencies

Decline in development insolvencies

June 23, 2025

Development a Luxurious House in Beverly Hills? Learn This First

September 28, 2023

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Midtown Atlanta's 60-Tale 1072 West Peachtree Skyscraper Reaches Building Milestone
  • FGIA Problems New Spec for Window Opening Regulate Gadgets
  • Morgan Sindall begins £29m Appleby Grammar challenge

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info