Monday, November 3, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Solar energy for Plymouth quarry

Machexpert by Machexpert
August 21, 2025
Home Construction
Share on FacebookShare on Twitter


Solar panels at Moorcroft Quarry
Sun panels at Moorcroft Quarry

Sun panels had been put in via Holcim UK at a Devon quarry to energy a part of its operations.

The 208 panels had been put in at the rooftop of workshops at Holcim’s Moorcroft web site in Plymouth.

The challenge, controlled via Burton-based Regenerco with set up performed via Aniron, will be capable of generate greater than 76,000 KWh of energy in line with 12 months, equating to 2 in line with cent of the web site’s annual energy wishes and leading to a saving of 15.9 tonnes of CO2 emissions in line with 12 months.

The Moorcroft web site, house to a limestone quarry with asphalt and readymix crops, is the newest location for the cement large’s ongoing renewable power rollout. It follows on from rooftop installations at its Hulland Ward, Bardon Hill and Callow websites within the final twelve months.

The sun set up at Holcim’s Callow plant close to Cheddar, installed via Regenerco and Aniron previous this 12 months, accommodates 464 sun photovoltaic panels with an annual output capability of 167,000 KWh.

Holcim UK power supervisor Joanna Walker mentioned: “Our preliminary focal point is on figuring out appropriate places for roof fixed sun throughout our UK websites. Moorcroft is a great addition to the scheme now we have already effectively applied and is helping us proceed to roll-out renewable power assets as a part of our Web 0 Technique, serving to us on our adventure to 0 emissions.

“We’ve additional schemes within the pipeline for the remainder of the 12 months together with each rooftop and floor fixed projects.”

Were given a tale? E mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

New Philadelphia Area Features Building Workforce
Construction

New Philadelphia Area Features Building Workforce

November 3, 2025
Building company fined after roof repairer’s fall
Construction

Building company fined after roof repairer’s fall

November 3, 2025
Faculty contract awards for tier ones
Construction

Faculty contract awards for tier ones

November 3, 2025
Lincoln ring street crowning glory licensed
Construction

Lincoln ring street crowning glory licensed

November 3, 2025
Next Post
Laing O’Rourke begins two jail expansions

Laing O’Rourke begins two jail expansions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

B Kentucky Mountain Limited-access highway Makes Connections : CEG

$1B Kentucky Mountain Limited-access highway Makes Connections : CEG

February 25, 2025
Best 5 Farm Stores with Places of work: Our Suggestions

Best 5 Farm Stores with Places of work: Our Suggestions

October 22, 2024

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • New Philadelphia Area Features Building Workforce
  • Building company fined after roof repairer’s fall
  • Faculty contract awards for tier ones

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info