Wednesday, October 22, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Mona offshore wind farm cleared for take off

Machexpert by Machexpert
July 7, 2025
Home Construction
Share on FacebookShare on Twitter


Power secretary Ed Miliband has signed the advance consent order for the Mona offshore wind challenge.

Mona might be positioned solely in Welsh waters within the east Irish Sea. The array house is 28.8 km from the north coast of Wales on the closest level, 46.9 km from the northwest coast of England and 46.6 km from the Isle of Guy.

It has a landfall close to Llanddulas, Conwy at the North Wales beach and a proposed connection to the present Bodelwyddan Nationwide Grid substation in Denbighshire.

It’s being advanced through an Anglo-German three way partnership of BP Selection Power Investments Restricted and Energie Baden-Württemberg AG (EnBW). Kent is offering the front-end engineering design.

Mona comprises as much as 96 generators, producing round 1.5GW of electrical energy in addition to 4 offshore substation platforms as much as 60 metres prime, together with offshore interconnector cables, inter-array cables and export cables.

The generators’ rotor blade diameter is 320 metres whilst the utmost blade tip peak is 364 metres.

The challenge additionally comes to onshore cables and an onshore substation.

The £4.8bn estimate price comprises construction and challenge control, financing, land acquisition and development.

Were given a tale? Electronic mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

Suspended prison sentence for rogue builder
Construction

Suspended prison sentence for rogue builder

October 22, 2025
Drilling unlocks information for Palace of Westminster recovery
Construction

Drilling unlocks information for Palace of Westminster recovery

October 22, 2025
First concrete poured for Scottish wind farm
Construction

First concrete poured for Scottish wind farm

October 22, 2025
Watkins Jones will get inexperienced gentle for 800 houses in Edinburgh | Information
Construction

Watkins Jones will get inexperienced gentle for 800 houses in Edinburgh | Information

October 22, 2025
Next Post
Specialists appointed for Eurostar terminal enlargement

Specialists appointed for Eurostar terminal enlargement

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

What does the fit-out sector appear to be after ISG’s death?

What does the fit-out sector appear to be after ISG’s death?

July 25, 2025
Farrans wins £59m Paisley highway hyperlink

Farrans wins £59m Paisley highway hyperlink

August 20, 2025

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Night time-Time Set up in Entrance of a German Fairytale Fortress
  • Tadano CC 38.650-1 Gets rid of Rabobank Emblem Signage From Euromast in Rotterdam
  • Sandvik Coromant hosts TechDays 2025 in India

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info