Tuesday, July 1, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Texas Hill Nation Highway Opens After Years of Making plans : CEG

asianlzw by asianlzw
February 10, 2025
Home Skid Steer
Share on FacebookShare on Twitter


The $13 million Klein Highway widening undertaking in Texas Hill Nation, which was once a part of a 2019 transportation bond undertaking, has been finished forward of agenda. This incorporated a four-lane phase, low-water crossing, and different improvements aimed toward making improvements to connectivity and protection for motorists. Different highway initiatives have been additionally incorporated within the bond program, totaling $143 million for quite a lot of infrastructure upgrades.

A view of the newly completed Klein Road widening project.

Town of New Braunfels picture

A view of the newly finished Klein Highway widening undertaking.


A view of the newly completed Klein Road widening project.   (City of New Braunfels photo)
Klein Road was widened to four lanes.   (City of New Braunfels photo)

A protracted-awaited Texas Hill Nation highway undertaking is after all completed and able for motorists, in keeping with mysantonio.com.

The $13 million Klein Highway widening building undertaking is whole, in keeping with a town of New Braunfels Fb put up from overdue December. The undertaking completed forward of agenda, as final touch was once anticipated within the fall of 2025.

The undertaking’s origins date to a 2019 transportation bond undertaking. J3 Co. of San Antonio, Texas, was once the contractor.

Klein Highway renovations come with roughly 3/4 mi. of enhancements, together with a four-lane phase, low-water crossing, Farm-to-Marketplace 725 intersection improvements, an 8-10-ft. shared used trail and 6-ft. sidewalks, in keeping with the 2019 Bond Program web page.

The low-water crossing will come with higher drainage and protection all through heavy rains.

Incorporated within the bond was once the $10.7 million reconstruction of Goodwin Lane from Farm to Marketplace Highway 306 to Conrads Lane and Conrads Lane from Goodwin Lane to Interstate 35; the $2.16 million rehabilitation of McQueeney Highway to support connectivity from I-35 to County Line Highway; and $2.5 million in enhancements to South Union Road from Commo Boulevard to Lincoln Boulevard.

The $143 million 2019 bond program had 4 propositions comparable to transportation infrastructure, park game, public protection and library amenities.




author avatar
asianlzw
See Full Bio
asianlzw

asianlzw

Related Posts

Hydraulic Drift for Skid Steer Attachments
Skid Steer

Hydraulic Drift for Skid Steer Attachments

June 25, 2025
Perfect 3-Level Rototillers: Most sensible Choices for Tractors
Skid Steer

Perfect 3-Level Rototillers: Most sensible Choices for Tractors

June 25, 2025
Most sensible Gear for Land Clearing – Skid Steers Direct
Skid Steer

Most sensible Gear for Land Clearing – Skid Steers Direct

June 18, 2025
What Operators Want to Know
Skid Steer

What Operators Want to Know

June 17, 2025
Next Post
Biochar in Concrete – Newbie’s Information

Biochar in Concrete - Newbie's Information

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

7 Tricks to Maximize Application Trailer Tires Lifespan

7 Tricks to Maximize Application Trailer Tires Lifespan

June 21, 2025

Virtual Builder Ep 80: Comparing Building Tendencies for 2024

March 12, 2024

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Permasteelisa wins façade package deal for 60 Gracechurch Side road
  • NV5 Awarded $20 Million in New York Town Park Amenities Design and Building Control Contracts
  • Regulator & Vent Traces 101: Secure Roof Termination Practices

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info