Thursday, February 12, 2026
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Willmott Dixon mobilises for Swansea and Gravesend sports activities schemes

Machexpert by Machexpert
February 12, 2026
Home Construction
Share on FacebookShare on Twitter


CGI of the planned National Institute for Sport & Health in Swansea
CGI of the deliberate Nationwide Institute for Game & Well being in Swansea

Willmott Dixon has began early works in Swansea at the new Nationwide Institute for Game & Well being.

And it’s quickly to transport on website online for Gravesend’s new Cascades Recreational Centre.

The Nationwide Institute for Game & Well being (NISH) is a four-storey construction for Swansea College, being constructed on the front to Swansea Bay Sports activities Park. It’s funded during the Swansea Bay Town Deal, with improve from Swansea Council and native well being forums.

Paintings to exchange an current pavilion at the website online at Sketty Lane began remaining month and whole structure starts within the coming weeks.

Pick out Everard is challenge supervisor, operating along architects Powell Dobson.

The two,000 sqm facility is designed to deliver in combination public, personal and educational sectors endeavor analysis and construction in sports activities and well being. NISH guarantees to improve start-ups and scale-ups to power product construction. It is going to additionally supply an anchor for a much wider Science and Innovation Park.  

“The Nationwide Institute for Game and Well being will assist put Swansea – and Wales – at the world map for state of the art analysis, product construction, and group well being innovation,” stated NISH director Keith Lloyd. “It is going to function a catalyst for discovery, funding, and stepped forward wellbeing.”

The development is predicted to open in 2027.

In the meantime, in Gravesend in Kent, Willmott Dixon and Gravesham Borough Council are transferring ahead with early website online process to organize the bottom for a brand new recreational centre. Demolition works will birth in early spring, clearing house for the brand new centre and getting ready the website online for setup.

The brand new Cascades Recreational Centre will substitute an current growing old facility. Plans come with a 25-metre pool, a 17-metre learner pool, aqua play and water flume space, spectator seating, a six-court sports activities corridor, multi-level cushy play zone, celebration and group rooms, and a café.

Willmott Dixon was once first introduced because the council’s structure spouse in September 2025, when it was once appointed for the pre-construction segment by way of a right away award during the Pagabo framework.

Richard Poulter, Willmott Dixon’s managing director within the south, stated: “That is a thrilling second as a result of other people will begin to see process on website online. The brand new recreational centre will probably be an impressive facility for the local people, combining sustainability with outstanding family-friendly areas.”

Willmott Dixon has constructed greater than 160 recreational amenities up to now decade, together with 108 swimming swimming pools.

The hole of the brand new Cascades Recreational Centre in Gravesend is predicted in 2028.

Were given a tale? Electronic mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

Fourth quarter output down 2.1%
Construction

Fourth quarter output down 2.1%

February 12, 2026
Slippage for Mace’s Paddington get started
Construction

Slippage for Mace’s Paddington get started

February 12, 2026
Development apparatus company problems benefit caution
Construction

Development apparatus company problems benefit caution

February 12, 2026
Liverpool Boulevard activity set for ultimate sign-off via summer time however place of job scheme no longer set to begin for 8 extra years | Information
Construction

Liverpool Boulevard activity set for ultimate sign-off via summer time however place of job scheme no longer set to begin for 8 extra years | Information

February 11, 2026
Next Post
Slippage for Mace’s Paddington get started

Slippage for Mace’s Paddington get started

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Building Consultancy Celebrates 5 Yr Milestone

Building Consultancy Celebrates 5 Yr Milestone

December 6, 2024

Cleveland Tank Recertified for ISO 9001:2015, Strengthening Dedication to High quality, Steady Growth

October 22, 2025

Newsletter

Categories

  • 2 Ton Mini Excavator
  • 2.5 Ton Mini Excavator
  • 3 ton mini excavator
  • Attachments
  • Bulldozer
  • Compact Equipment
  • Compact Excavators
  • Compaction Technology
  • Construction
  • Construction Industry
  • Construction Project Management
  • Double Drum Rollers
  • Forklift
  • Heavy Equipment
  • Hydraulic Excavators
  • Information Depot
  • Kubota Diesel Engines
  • Machinery Maintenance
  • Mini Excavator
  • Mini Excavator Attachments
  • Mini Excavators
  • Mini Skid Steer
  • Plate compactor
  • Ride-On Roller Compactors
  • Roller Compactor Accessories
  • Roller Compactor Industry News
  • Roller Compactor Maintenance
  • Roller Compactor Safety
  • Roller Compactor Types
  • Roller Compactors
  • Roller Compactors with Spikes
  • Single Drum Roller
  • Skid Steer
  • Skid Steer Attachments
  • Smooth Drum Roller
  • Soil Compaction Equipments
  • Steam Rollers
  • Typhon Machinery
  • Uncategorized
  • vibratory roller
  • Wheel Loader
  • Wheel Loader Attachments

Recent Posts

  • Fourth quarter output down 2.1%
  • Slippage for Mace’s Paddington get started
  • Willmott Dixon mobilises for Swansea and Gravesend sports activities schemes

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info