Tuesday, February 17, 2026
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Muse introduced in for Barrow’s Marina Village

Machexpert by Machexpert
January 22, 2026
Home Construction
Share on FacebookShare on Twitter


the Marina Village vision
the Marina Village imaginative and prescient

Westmorland & Furness Council has introduced in Muse to paintings on its Marina Village plans, which is able to search to supply round 1,350 new houses, a nature conservation house and new public open areas. 

Councillors have agreed to award a pre-development services and products settlement to Muse Puts and its provide chain companions inside of ECF (previously English Towns Fund).  ECF is a partnership between Houses England, Criminal & Normal and Muse.

Council chief Jonathan Brook mentioned: “This scheme will play an important function sooner or later good fortune of Barrow. This is a key a part of the supply plans for Workforce Barrow. A vital period of time, paintings and investment has long past into getting us to this degree. We are actually very a lot taking a look ahead to running with Muse and ECF in this undertaking and in conjunction with companions and the area people, to increase the imaginative and prescient for this website online and for it to transform a thriving residential neighborhood.”

The council’s imaginative and prescient for Marina Village is for a waterfront neighbourhood alongside Barrow’s lively ancient docks, inside of strolling distance of town centre.

Paintings is below method to remediate the second one segment of nineteen hectares, getting ready the land for brand spanking new houses, supported through £24.8m of Brownfield, Infrastructure and Land (BIL) investment from Houses England. Section some of the advancement – the remediation of six hectares of land funded through £5.5m from the federal government’s Getting Development Fund, used to be finished in November 2023.  

Section two comprises flooring remediation and the set up of related supporting infrastructure, together with a realigned Cavendish Dock Highway, in addition to the diversion or coverage of utilities. The undertaking may also relocate a council waste depot to a brief website online.

Making plans popularity of segment 3, which incorporates remediation and realignment of Cavendish Dock Highway, used to be granted in November 2025 and can lend a hand release an extra 16% of the website online, as soon as a biodiversity web achieve credit score software has been licensed.

The pre-development settlement with Muse and ECF will fee early paintings to arrange Marina Village for the following degree, together with preliminary design and making plans, a investment technique and undertaking governance. Following this, a grasp advancement settlement is anticipated, environment out how Marina Village is introduced ahead over the years.  

Were given a tale? Electronic mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

New chartered designation for civil engineering surveyors
Construction

New chartered designation for civil engineering surveyors

February 17, 2026
Kier appoints sustainability director
Construction

Kier appoints sustainability director

February 17, 2026
Grasp planner appointed for ultimate degree of Battersea regeneration
Construction

Grasp planner appointed for ultimate degree of Battersea regeneration

February 17, 2026
Native government hit by means of trades’ pay dispute
Construction

Native government hit by means of trades’ pay dispute

February 17, 2026
Next Post
Layton turns into CECE president

Layton turns into CECE president

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Golden Gate Bridge Seismic Retrofit Ultimate Stages Way

September 30, 2025
The Ironpeddlers Celebrates fiftieth 12 months in Industry : CEG

The Ironpeddlers Celebrates fiftieth 12 months in Industry : CEG

July 21, 2024
Facebook Twitter Pinterest Youtube

Newsletter

Categories

  • 2 Ton Mini Excavator
  • 2.5 Ton Mini Excavator
  • 3 ton mini excavator
  • Attachments
  • Bulldozer
  • Compact Equipment
  • Compact Excavators
  • Compaction Technology
  • Construction
  • Construction Industry
  • Construction Project Management
  • Double Drum Rollers
  • Forklift
  • Heavy Equipment
  • Hydraulic Excavators
  • Information Depot
  • Kubota Diesel Engines
  • Machinery Maintenance
  • Mini Excavator
  • Mini Excavator Attachments
  • Mini Excavators
  • Mini Skid Steer
  • Plate compactor
  • Ride-On Roller Compactors
  • Roller Compactor Accessories
  • Roller Compactor Industry News
  • Roller Compactor Maintenance
  • Roller Compactor Safety
  • Roller Compactor Types
  • Roller Compactors
  • Roller Compactors with Spikes
  • Single Drum Roller
  • Skid Steer
  • Skid Steer Attachments
  • Smooth Drum Roller
  • Soil Compaction Equipments
  • Steam Rollers
  • Typhon Machinery
  • Uncategorized
  • vibratory roller
  • Wheel Loader
  • Wheel Loader Attachments

Recent Posts

  • New chartered designation for civil engineering surveyors
  • GE Aerospace Primes a Provider Ecosystem in India
  • Kier appoints sustainability director

© 2026 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2026 All rights reserved by machineryasia.info