Friday, October 17, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Willmott Dixon on board for Gravesend Recreational Centre

Machexpert by Machexpert
September 10, 2025
Home Construction
Share on FacebookShare on Twitter


What the new Cascades Leisure Centre is exepcted to look like
What the brand new Cascades Recreational Centre is exepcted to seem like

Gravesham Borough Council has appointed Willmott Dixon for the pre-construction section of the brand new Cascades Recreational Centre in Gravesend thru an instantaneous award by means of the Pagabo framework.

Willmott Dixon is operating along challenge architect Area & Position and engineering marketing consultant AtkinsRealis to expand the technical design and specification for the brand new recreational facility, which is able to exchange an present getting old centre of the similar title.

Gravesham Borough Council decided on Willmott Dixon and its design staff following its structure of the within sight Cozenton Park Sports activities Centre in Rainham for Medway Council, which opened in 2024.

The brand new Cascades may have a 25-metre pool, a 17-metre learner pool, an aqua play and water flume house, in conjunction with a spectator viewing house. There can also be a sports activities corridor with six courts and tiered seating, a multi-level comfortable play zone, birthday celebration and group rooms and a café, all at the floor flooring.

The £43m challenge is being in part funded thru £17m from the federal government’s £20m levelling up fund allocation to Gravesham Borough Council.

All the way through the pre-construction section, which runs till August 2026, Willmott Dixon will adopt detailed website online surveys, logistics making plans and website online set-up works. The corporate will even habits an asbestos survey of Regan’s Bar forward of its demolition later this 12 months, whilst making sure the prevailing Cascades Recreational Centre stays operational right through structure.

The pre-construction contract positions Willmott Dixon to growth to primary contractor appointment in August 2026, with structure due for final touch in December 2028.

Were given a tale? E-mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

Improve for ancient solid iron railway bridge
Construction

Improve for ancient solid iron railway bridge

October 17, 2025
Get Impressed: Yard Tasks Made Easy with the Challenge Professional™ Screw Using Device from Simpson Robust-Tie
Construction

Get Impressed: Yard Tasks Made Easy with the Challenge Professional™ Screw Using Device from Simpson Robust-Tie

October 17, 2025
Builder given suspended prison sentence after roof artisan fell to his dying
Construction

Builder given suspended prison sentence after roof artisan fell to his dying

October 17, 2025
Standardised sanatorium room unveiled
Construction

Standardised sanatorium room unveiled

October 17, 2025
Next Post
McAlpine passed lead function for Manchester well being spa

McAlpine passed lead function for Manchester well being spa

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Graham lands £90m Belfast cruise terminal

Graham lands £90m Belfast cruise terminal

April 29, 2025

How SKUS Can Strengthen Development Stock Control

October 24, 2023

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Rolls-Royce expands strategic partnership with Bharat Forge to fabricate fan blades for its Pearl 10x engines
  • Volvo Development Apparatus Displays Constant Profitability Regardless of Marketplace Pressures in Q3 2025
  • Improve for ancient solid iron railway bridge

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info