Tuesday, December 16, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Graham cleans up with £50m nuclear waste deal

Machexpert by Machexpert
August 22, 2025
Home Construction
Share on FacebookShare on Twitter


The low-level waste repository site near Drigg
The low-level waste repository web page close to Drigg

Graham has been awarded the £49.6m built-in web page works framework (ISWF), a four-year contract that can ship a spread of infrastructure and operational enhance initiatives.

This comprises changing or upgrading getting older essential infrastructure, sporting out demolition and remediation works, putting in and commissioning new operational methods and supporting long term operations on the repository web page.

This paintings is further to Graham’s appointment in handing over the southern trench cap meantime membrane (STIM), undertaking which comes to striking a brand new protecting membrane over the legacy disposal trenches, enabling long term capping operations.

Graham contracts director Alastair Lewis stated: “Our appointment to the ISWF represents our a success collaboration on the repository web page. Works will begin this month, and we’re dedicated to offering high quality answers in long term proofing operations on the web page.”

Mike Pigott, director of websites and operations at Nuclear Waste Products and services, added: “This paintings will support and lengthen the lifetime of essential infrastructure on the repository web page, very important for our enduring challenge of constructing radioactive waste completely secure, faster.

“Graham brings the technical experience and collaborative ethos we want to ship our paintings safely, sustainably and with a dedication to being a excellent neighbour, and we’re excited to transport ahead with companions who percentage our values and ambition.”

Were given a tale? E mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

Cleansing Up After House Reworking
Construction

Cleansing Up After House Reworking

December 16, 2025
4,600-tonne viaduct slid over are living highway
Construction

4,600-tonne viaduct slid over are living highway

December 15, 2025
Sculptural seashore tower celebrates fluid, light-filled design
Construction

Sculptural seashore tower celebrates fluid, light-filled design

December 15, 2025
Plans for Manchester island district cross in
Construction

Plans for Manchester island district cross in

December 15, 2025
Next Post
Cruden secures permission for Edinburgh building

Cruden secures permission for Edinburgh building

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Rhode Island Has 10 Key Freeway Tasks of Quite a lot of Sizes Going On This Summer season

July 29, 2025

Easy methods to Tie Down Apparatus on Trailers

January 31, 2024

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Cleansing Up After House Reworking
  • Lengthy-Time period Sturdiness The place Water Meets the Highway
  • Georgia's Fortress Gillem Set to Obtain Greatest Army Investment Amongst State's Installations

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info