The I-35 Capital Categorical Central venture by way of TxDOT comes to reconstructing I-35 with flood prevention measures, together with drainage tunnels and a pump station to control stormwater. With paintings scheduled till 2029, the $1.1 billion venture is aimed toward bettering infrastructure alongside the hall to Airport Street and Holly Boulevard, bettering flood prevention and operational get right of entry to….
Supply hyperlink