Wednesday, October 22, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Mace decided on for £1.1bn British Library building

Machexpert by Machexpert
August 7, 2025
Home Construction
Share on FacebookShare on Twitter


The British Library extension is designed by RSHP and Arup
The British Library extension is designed through RSHP and Arup

Mace has been appointed to guide the development through British Library’s building spouse SMBL, a subsidiary of Mitsui Fudosan of Japan.

Mace will sign up for the challenge below the route of building supervisor Stanhope and can give a contribution development experience for the procurement and supply segment of the advance.

The scheme features a 100,000 sq feet (9,290 sq m) extension to the British Library comprising new areas to give a boost to the library’s public provider be offering in addition to greater than 600,000 sq feet (55,742 sq m) of business amenities.  The challenge contains exhibition galleries, occasions areas and finding out amenities. 

It’s designed through architects RSHP and engineers Arup.

Development is anticipated to begin on website in 2026 as soon as detailed design is entire and making plans stipulations met.  The development paintings is anticipated to take round six years to finish.

Mace Staff leader govt Jason Millett, stated: “We’re extremely joyful to be decided on as Development Supervisor for the British Library building proposals.  This can be a high-profile challenge with global importance and Mace’s customary experience and monitor file in handing over different primary schemes make us neatly positioned for this function.”

Were given a tale? E mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

Suspended prison sentence for rogue builder
Construction

Suspended prison sentence for rogue builder

October 22, 2025
Drilling unlocks information for Palace of Westminster recovery
Construction

Drilling unlocks information for Palace of Westminster recovery

October 22, 2025
First concrete poured for Scottish wind farm
Construction

First concrete poured for Scottish wind farm

October 22, 2025
Watkins Jones will get inexperienced gentle for 800 houses in Edinburgh | Information
Construction

Watkins Jones will get inexperienced gentle for 800 houses in Edinburgh | Information

October 22, 2025
Next Post
RICS survey finds flat workloads however persisted optimism

RICS survey finds flat workloads however persisted optimism

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

How Challenge Managers Can Get ready for the Long term of Development 

How Challenge Managers Can Get ready for the Long term of Development 

November 25, 2024
Virtual Builder Ep 109: Absolute best Practices for Contract Disputes

Virtual Builder Ep 109: Absolute best Practices for Contract Disputes

February 1, 2025

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Stellar Introduces Better Hooklift to Landscapers at 2025 Equip Expo
  • Rohde & Schwarz and TRUMPF conform to collaborate on drone protection
  • Night time-Time Set up in Entrance of a German Fairytale Fortress

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info