Tuesday, June 24, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

MassDOT OKs $1.1B for Cape Cod Bridge Substitute Program

asianlzw by asianlzw
June 24, 2025
Home Construction
Share on FacebookShare on Twitter



The Massachusetts Dept. of Transportation’s board of administrators licensed an roughly $18.5-billion, five-year capital funding plan, together with $1.09 billion for the long-anticipated Cape Cod Bridges Program. At 90 years outdated, the Sagamore Bridge and the Bourne Bridge—the one street crossings over the Cape Cod Canal—are each thought to be functionally out of date via MassDOT. 

Lots of the plan’s fund for changing the 2 bridges would pass towards the section one building of the brand new Sagamore Bridge. The bridges are owned via the U.S. Military Corps of Engineers, however underneath the phrases of an settlement between the state and the Corps, MassDOT can be chargeable for the substitute tasks and can personal, function and care for each bridges as soon as they’re entire. The deliberate twin-arch bridges would additionally come with shared-use paths for pedestrians and cyclists. 

Changing each bridges is estimated to price greater than $4.5 billion, consistent with media studies, together with $2.1 billion for the Sagamore. The state has already secured $2.3 billion for the mission, together with a number of federal grants and appropriations in addition to state bonds.

The Corps estimates that keeping up the prevailing bridges all the way through the following 50 years would price $775 million. Preconstruction at the new bridges began previous this yr and building is scheduled to start out in 2027, consistent with media studies. 

The capital funding plan additionally allocates greater than $1 billion for the Massachusetts Bay Transportation Authority, together with investment for energy gadget upgrades.  

Along with the Cape Cod Bridge and MBTA budget, the capital plan additionally allots $424 million for the I-90 Allston Multimodal mission; $276 million for the I-195 to Direction 18 interchange rehabilitation in New Bedford; $210 million for the continued I-90/I-495 interchange enhancements in Hopkinton and Westborough; $241 million to switch the Kernwood Street Bridge over the Danvers River and the Corridor-Whitaker Drawbridge over the Bass River in Beverly and Salem; $269 million to enhance the Rourke Bridge substitute in Lowell; $176 million to switch the Arthur J. McKenna Bridge in Springfield and West Springfield; and $149 million to advance tasks that enhance West-East Rail.

There’s additionally budget for bicycle and pedestrian infrastructure and native roadways and bridges, in addition to $14 million for runway reconstruction for the Beverly Regional Airport.

“Each and every transportation funding is an funding in other people—connecting them to jobs, faculties, healthcare, and every different,” Monica Tibbits-Nutt, MassDOT secretary and leader government, mentioned in a observation. “We’ve a powerful five-year capital funding plan that displays our shared priorities and offers us the gear to stay construction a extra hooked up, equitable Massachusetts.” 


author avatar
asianlzw
See Full Bio
asianlzw

asianlzw

Related Posts

Robotic brickie builds Durham homes
Construction

Robotic brickie builds Durham homes

June 24, 2025
Volvo Building Apparatus in double technique transfer
Construction

Volvo Building Apparatus in double technique transfer

June 24, 2025
High quality crew requires HSE to lose Development Protection Regulator
Construction

High quality crew requires HSE to lose Development Protection Regulator

June 24, 2025
Adjustments at Barratt North East
Construction

Adjustments at Barratt North East

June 24, 2025
Next Post
CHA Acquires California-based FALCON Engineering Products and services,

CHA Acquires California-based FALCON Engineering Products and services,

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

What’s a Steady Load Trail?

May 14, 2024
Can I Use a Automobile Quilt with an Open Trailer

Can I Use a Automobile Quilt with an Open Trailer

August 3, 2024

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Can You Dig It? Archeologists Discover Megafauna Bones
  • Abbott Declares Building of New Panhandle Clinic
  • I-5 Growth Venture Below Method in Snohomish County

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info