Wednesday, October 15, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Price lists Force Surge in March Building Fabrics Costs

asianlzw by asianlzw
April 15, 2025
Home Construction
Share on FacebookShare on Twitter


WASHINGTON, DC — Construction input prices increased 0.5% in March, according to an Associated Builders and Contractors analysis of US Bureau of Labor Statistics’ Producer Price Index data released April 11. Nonresidential construction input prices increased 0.6% for the month.

Both overall and nonresidential construction input prices are 0.8% higher than one year ago. While crude petroleum prices fell considerably in March, that decline was more than offset by rapidly rising natural gas, steel, copper and lumber prices.

“Construction input prices increased at a rapid pace for the third consecutive month in March and have now risen at a 9.7% annualized rate through the first quarter of 2025,” said ABC Chief Economist Anirban Basu. “The emerging effects of tariffs are glaring in the March data release, with iron and steel, steel mill products and copper wire and cable prices all rising more than 5% for the month. While contractors remain busy for the time being, according to ABC’s Construction Backlog Indicator, this pace of input price escalation, coupled with rising uncertainty, will cause projects to be delayed and canceled if it persists for any meaningful length of time.”

producerpriceindexmarch2025

producerpriceindexmonthlypercentchange

Visit abc.org/economics for the Construction Backlog Indicator and Construction Confidence Index, plus analysis of spending, employment, job openings and the Producer Price Index.


author avatar
asianlzw
See Full Bio
asianlzw

asianlzw

Related Posts

3 Hidden Prices of the Unsuitable Mission Knowledge Instrument
Construction

3 Hidden Prices of the Unsuitable Mission Knowledge Instrument

October 14, 2025
Hill indicators for Bristol’s Baltic Wharf
Construction

Hill indicators for Bristol’s Baltic Wharf

October 14, 2025
Clarion sticks with Lovell for Plymouth scheme
Construction

Clarion sticks with Lovell for Plymouth scheme

October 14, 2025
Smartly-managed freeway information to be up to date
Construction

Smartly-managed freeway information to be up to date

October 14, 2025
Next Post
Scandi scientists measure price of tunnel corrosion

Scandi scientists measure price of tunnel corrosion

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Mammoet SK6000 Crane Completes Totally Electrical Operations Checking out : CEG

Mammoet SK6000 Crane Completes Totally Electrical Operations Checking out : CEG

December 3, 2024
Engineer ECS, Engineers With out Borders Repair Impassible Highway in Africa

Engineer ECS, Engineers With out Borders Repair Impassible Highway in Africa

May 31, 2025

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Creation: Why Manufacturing unit Audits Subject in Excavator Procurement
  • Powering the Long term: Milwaukee Instrument makes important donation to UW-Platteville’s Building Control Program
  • 3 Hidden Prices of the Unsuitable Mission Knowledge Instrument

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info