Tuesday, September 16, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Stelling starts 2nd Southampton scheme for college students

Machexpert by Machexpert
March 13, 2025
Home Construction
Share on FacebookShare on Twitter


CGI of the planned development for 119 High Street in Southampton
CGI of the deliberate construction for 119 Top Side road in Southampton

Modular development specialist Stelling Houses is hanging up 257 studio residences for college students at 119 Top Side road in Southampton.

It’s Stelling’s greatest and maximum formidable challenge so far – two times the dimensions of any of its earlier tendencies.

Demolition paintings has begun on two Nineteen Sixties industrial constructions,  which will probably be changed by way of 3 pupil blocks, from 3 to 6 storeys prime. The brand new blocks can have a mixture of one- and two-bed studios of various sizes, together with some condo clusters with communal kitchens.

Communal facilities will come with a gymnasium, learn about spaces, living room areas, eating room, karaoke room, espresso station, assembly rooms, video games room and laundry.

This scheme follows Stelling’s Bargate Area pupil lodging construction additionally on Southampton Top Side road, which regenerated and reworked a derelict website online.

Related Information

As with Bargate Area, the brand new pupil advanced at 119 Top Side road will probably be operated by way of pupil landlord Unilife.

José Ignacio Alvarez, founder and government chair of Stelling Houses, mentioned: “This challenge is a big milestone for Stelling Houses. It’ll be our greatest modular pupil construction so far and our maximum sustainable, being with regards to web 0 and focused on a BREEAM superb score. Our use of complicated offsite production era permits us to totally have compatibility out and furnish every studio in our Hampshire manufacturing unit. This may increasingly radically scale back the construct programme and disruption throughout development, and can be sure that previous profession for college students wanting high quality lodging.”

Demolition works have began on website online and preparation is now beneath means for archaeological excavations. A concrete podium will probably be built at flooring flooring stage to deal with the shared social facilities.

A complete of 263 metal-framed modules will probably be manufactured and craned into place for the non-public dwelling house by way of spring 2026. The primary scholars are anticipated in September 2026 for the beginning of the brand new instructional yr.

Stelling will set up the sunshine stone and crimson brick façade finishes offsite in its manufacturing unit, decreasing paintings on website online even additional and demonstrating some other development in its offsite development answers.

Were given a tale? Electronic mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

Color Psychology and Your House
Construction

Color Psychology and Your House

September 15, 2025
McLaren builds Swindon warehouse
Construction

McLaren builds Swindon warehouse

September 15, 2025
Govt recommended to scrap levies and subsidise consumers to rescue housing supply within the capital
Construction

Govt recommended to scrap levies and subsidise consumers to rescue housing supply within the capital

September 15, 2025
Control buyout for Belfast architects
Construction

Control buyout for Belfast architects

September 15, 2025
Next Post
0M of drainage apparatus passed over to Area 5

$100M of drainage apparatus passed over to Area 5

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Pointers For Getting New Utilities Put in

April 14, 2024
Beef up Brooke’s Area with Manitowoc’s restricted version ‘Construction In combination’ shirts : CEG

Beef up Brooke’s Area with Manitowoc’s restricted version ‘Construction In combination’ shirts : CEG

February 17, 2025

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • The AED Basis Celebrates one centesimal Authorised School Program With Tennessee School of Carried out Generation – Harriman
  • Color Psychology and Your House
  • Concrete Foundations Affiliation Appoints 3 Business Leaders to Legacy Committee

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info