Friday, December 5, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

British Museum seeks specialists

Machexpert by Machexpert
March 7, 2025
Home Construction
Share on FacebookShare on Twitter


Indicative image of the Western Range plans © Wright & Wright Architects
Indicative symbol of the Western Vary plans © Wright & Wright Architects

British Museum has revealed a young understand inviting hobby from specialists for a four-year building consultancy services and products framework to interchange its present framework that started in 2021. 

The framework is split into seven a lot: task control; amount surveying and business control; mechanical and electric engineering (together with hearth coverage, safety, lights, acoustics, lifts); structure and inner design; structural & civil engineering; hearth protection engineering; and surveying (measured surveys and 3-d modelling). 

The framework is for ongoing and project-based paintings proper around the museum’s Bloomsbury property in London, which can supplement and reinforce the British Museum’s masterplan initiatives such because the Western Vary and Power Centre. 

The primary segment of the masterplan used to be finished remaining summer season – building of the British Museum Archaeological Analysis Assortment (BM_ARC) close to Studying.

The second one segment of the masterplan is to overtake the museum’s power infrastructure. The Power Centre Programme will see the phasing out of fossil fuels and a shift to low-carbon power.

Related Information

The 3rd segment is the redevelopment of the museum’s Western Vary, which contains all of the galleries to the west of the Nice Court docket. Because it opened in 1857, the British Museum constructions have developed progressively to deal with extra guests and artefact. It now desires to revamp and rebuild a few of the ones constructions and installed new ‘customer welcome pavilions’ at each entrances to the museum.

Russell Torrance, director of estates & capital initiatives on the British Museum, mentioned: “The British Museum is within the strategy of turning in one of the vital greatest and most complicated cultural renovations any place on this planet, decarbonising its operations and reworking the revel in of the constructions and surrounding public realm for guests, group of workers and collaborators alike.

“Whilst the hot center of attention has been on large-scale competitions, we additionally require a framework of authorized provide chain companions that may take at the vital ongoing paintings of asset renewal and alternative, development conservation and modernisation throughout our property. I urge entries from all specialists concerned about contributing to the tradition of task control and design excellence we’re growing right here on the museum.”

The procurement is being supported through Mortice Consulting and the cut-off date for responses at the Delta portal is 24th March 2025.

See: www.find-tender.carrier.gov.united kingdom/Realize/006559-2025

Were given a tale? Electronic mail information@theconstructionindex.co.united kingdom



Supply hyperlink

author avatar
Machexpert
See Full Bio
Machexpert

Machexpert

Related Posts

Heidelberg UK injects carbon dioxide into concrete blend
Construction

Heidelberg UK injects carbon dioxide into concrete blend

December 5, 2025
Approval secured for Ravenscraig Steelworks reclamation
Construction

Approval secured for Ravenscraig Steelworks reclamation

December 5, 2025
Roof craftsman prosecuted for refusing to co-operate with HSE
Construction

Roof craftsman prosecuted for refusing to co-operate with HSE

December 5, 2025
UK lacks the abilities to hit web 0, MPs warn
Construction

UK lacks the abilities to hit web 0, MPs warn

December 5, 2025
Next Post
Hornsea 3 provide chain takes form

Hornsea 3 provide chain takes form

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Kobelco re-launches SK17SR-3E mini excavator

October 21, 2023
Earnings upward thrust at Tilbury Douglas

Earnings upward thrust at Tilbury Douglas

May 2, 2025

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Heidelberg UK injects carbon dioxide into concrete blend
  • Approval secured for Ravenscraig Steelworks reclamation
  • Roof craftsman prosecuted for refusing to co-operate with HSE

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info