Tuesday, September 16, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Man F. Atkinson, Clark Water Have a good time Groundbreaking of LYHBeyond : CEG

asianlzw by asianlzw
November 2, 2024
Home Skid Steer
Share on FacebookShare on Twitter


Man F. Atkinson Building and Clark Water celebrated the groundbreaking of LYHBeyond, the Blackwater CSO Tunnel challenge in Lynchburg. The challenge goals to give protection to the James River from mixed hurricane and sewer occasions, with of entirety anticipated in 2027. Stantec and Wiley Wilson are some of the challenge leads.

On Oct. 29, Man F. Atkinson Building and Clark Water broke flooring along town of Lynchburg officers at the LYHBeyond, the Blackwater CSO Tunnel challenge.

The brand new tunnel and pump station will create garage capability and infrastructure to make certain that the James River is secure from mixed hurricane and sewer occasions, marking a notable step in opposition to Atkinson and Clark Water’s shared venture to ship advanced infrastructure to give protection to the communities, folks and ecosystems the place we are living.

The Blackwater CSO Tunnel will get started on the CSO 52 web site situated alongside the Level of Honor Path and can trip all of the approach to the ground of 7th Side road in downtown Lynchburg, following the trail of the Blackwater Creek towards the James River.

The scope of the challenge features a new 4,715-ft. mixed sewer overflow (CSO) tunnel with an inner diameter of 12 feet., in addition to a number of new diversion and overflow constructions to divert extra flows from the Blackwater Creek Interceptor (BWCI) and James River Interceptor (JRI) into the tunnel and pump station respectively.

The dewatering pump station is designed to streamline the tunnel and shaft draining procedure to roughly 24-36 hours.

To beef up the pump station, {an electrical} construction additionally might be constructed to deal with and deal with the essential electric, instrumentation and keep an eye on elements. Along with the brand new constructions and their related application wishes, on-site recovery might be carried out right through the challenge.

Stantec is the challenge engineer, and Wiley Wilson is the challenge architect. Really extensive of entirety is slated for summer time 2027.

For more info in regards to the challenge, talk over with https://www.lyhbeyond.org/

For more info about Man F. Atkinson Building and Clark Water, talk over with atkn.com and www.clarkgroup.com/firms/clark-water.




author avatar
asianlzw
See Full Bio
asianlzw

asianlzw

Related Posts

Price, Weight, Width & Not unusual Makes use of – Skid Steers Direct
Skid Steer

Price, Weight, Width & Not unusual Makes use of – Skid Steers Direct

September 11, 2025
Forestry Mulchers for Land Clearing Are in Top Call for
Skid Steer

Forestry Mulchers for Land Clearing Are in Top Call for

September 4, 2025
The Hidden Danger to Your Ultimate Power Motor
Skid Steer

The Hidden Danger to Your Ultimate Power Motor

September 1, 2025
How A lot Does a Skid Steer Weigh? Skid Steer Weight & Dimensions – Skid Steers Direct
Skid Steer

How A lot Does a Skid Steer Weigh? Skid Steer Weight & Dimensions – Skid Steers Direct

August 29, 2025
Next Post
Information to A hit Building Contract Control 

Information to A hit Building Contract Control 

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

Promotion for Brundell at Willmott Dixon

Promotion for Brundell at Willmott Dixon

August 28, 2025

Potency Meets Precision With the Mulcher for Mini Excavator

September 25, 2023

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • TOMRA Recycling Unveils Finder Colour: Subsequent-Era Colour Sorting for Prime-Purity Steel Restoration
  • Abbott Touts 10-Yr, $146B Funding in Transportation
  • Bechtel Wins $9B in Contracts for Rio Grande LNG Tasks

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info