Monday, June 16, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

Man F. Atkinson, Clark Water Have a good time Groundbreaking of LYHBeyond : CEG

asianlzw by asianlzw
November 2, 2024
Home Skid Steer
Share on FacebookShare on Twitter


Man F. Atkinson Building and Clark Water celebrated the groundbreaking of LYHBeyond, the Blackwater CSO Tunnel challenge in Lynchburg. The challenge goals to give protection to the James River from mixed hurricane and sewer occasions, with of entirety anticipated in 2027. Stantec and Wiley Wilson are some of the challenge leads.

On Oct. 29, Man F. Atkinson Building and Clark Water broke flooring along town of Lynchburg officers at the LYHBeyond, the Blackwater CSO Tunnel challenge.

The brand new tunnel and pump station will create garage capability and infrastructure to make certain that the James River is secure from mixed hurricane and sewer occasions, marking a notable step in opposition to Atkinson and Clark Water’s shared venture to ship advanced infrastructure to give protection to the communities, folks and ecosystems the place we are living.

The Blackwater CSO Tunnel will get started on the CSO 52 web site situated alongside the Level of Honor Path and can trip all of the approach to the ground of 7th Side road in downtown Lynchburg, following the trail of the Blackwater Creek towards the James River.

The scope of the challenge features a new 4,715-ft. mixed sewer overflow (CSO) tunnel with an inner diameter of 12 feet., in addition to a number of new diversion and overflow constructions to divert extra flows from the Blackwater Creek Interceptor (BWCI) and James River Interceptor (JRI) into the tunnel and pump station respectively.

The dewatering pump station is designed to streamline the tunnel and shaft draining procedure to roughly 24-36 hours.

To beef up the pump station, {an electrical} construction additionally might be constructed to deal with and deal with the essential electric, instrumentation and keep an eye on elements. Along with the brand new constructions and their related application wishes, on-site recovery might be carried out right through the challenge.

Stantec is the challenge engineer, and Wiley Wilson is the challenge architect. Really extensive of entirety is slated for summer time 2027.

For more info in regards to the challenge, talk over with https://www.lyhbeyond.org/

For more info about Man F. Atkinson Building and Clark Water, talk over with atkn.com and www.clarkgroup.com/firms/clark-water.




author avatar
asianlzw
See Full Bio
asianlzw

asianlzw

Related Posts

Which One Is Proper for Your Mission? – Skid Steers Direct
Skid Steer

Which One Is Proper for Your Mission? – Skid Steers Direct

June 15, 2025
Sorts, Sizes, and Easiest Makes use of – Skid Steers Direct
Skid Steer

Sorts, Sizes, and Easiest Makes use of – Skid Steers Direct

June 14, 2025
Ultimate Pressure Leaks and Why You Shouldn’t Forget about Them
Skid Steer

Ultimate Pressure Leaks and Why You Shouldn’t Forget about Them

June 4, 2025
Find out how to Make a choice the Easiest Grader Attachment for Your Skid Steer – Skid Steers Direct
Skid Steer

Find out how to Make a choice the Easiest Grader Attachment for Your Skid Steer – Skid Steers Direct

May 30, 2025
Next Post
Information to A hit Building Contract Control 

Information to A hit Building Contract Control 

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

The Function of GreenPro Certification in Lowering Carbon Footprint

The Function of GreenPro Certification in Lowering Carbon Footprint

September 27, 2024

Used Apparatus Marketplace In March 2024: Gross sales, Traits And Methods

April 9, 2024

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Nationwide Highways will get some other £590m to spend on stalled challenge
  • The Function of Cell Apps in Streamlining Building Undertaking Control and Actual Property Construction
  • The Best possible Hollywood Replicate Lighting fixtures for Flawless Make-up Utility

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info