Wednesday, October 22, 2025
Machinery ASIA
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop
No Result
View All Result
Machinery Asia
No Result
View All Result

CBNA, Halmar win $819M Potomac River Tunnel contract

asianlzw by asianlzw
October 18, 2023
Home Construction
Share on FacebookShare on Twitter


Award: Potomac River Tunnel
Price: $819 million
Location: Washington, D.C.
Consumer: District of Columbia Water and Sewer Authority

The District of Columbia Water and Sewer Authority’s board of administrators authorized a $819 million design-build contract previous this month for the building of the Potomac River Tunnel, the biggest ever awarded via the authority, in keeping with a press unencumber.

The 5.5-mile-long tunnel targets to keep an eye on sewer overflows into the Potomac River and paperwork a part of the $2.99 billion Blank Rivers Mission, an initiative to strengthen space water high quality.

The three way partnership of Miami-based CBNA and Nanuet, New York-based Halmar World will construct the 18-foot diameter tunnel, which is able to run underneath the Georgetown waterfront in Washington, D.C., and hook up with the present Anacostia River Tunnel. The CBNA and Halmar group be expecting to start paintings at the mission in 2024, with of entirety in early 2030, in keeping with the discharge.

Development would require two tunnel dull machines: one will mine south thru most commonly comfortable flooring and the opposite will head north to bore thru rock. As soon as operational, the Potomac River Tunnel will scale back mixed sewer overflows to the Potomac River via 93% in a median 12 months of rainfall, in keeping with DC Water. 

That can be a big success for the full Blank Rivers Mission, stated David Gadis, DC Water CEO and basic supervisor.

“The Blank Rivers Mission is a gamechanger for the district,” stated Gadis. “We’ve already noticed the have an effect on the finished Anacostia River tunnel device is having at the well being of that river, and we predict an identical effects for the Potomac on account of this mission.”

The Blank Rivers Mission is DC Water’s ongoing program to cut back mixed sewer overflows into the district’s waterways, specifically the Anacostia River, Potomac River and Rock Creek. The mission is a large infrastructure and toughen program designed to seize and blank wastewater right through rainfalls ahead of it reaches the ones rivers.


author avatar
asianlzw
See Full Bio
asianlzw

asianlzw

Related Posts

Suspended prison sentence for rogue builder
Construction

Suspended prison sentence for rogue builder

October 22, 2025
Drilling unlocks information for Palace of Westminster recovery
Construction

Drilling unlocks information for Palace of Westminster recovery

October 22, 2025
First concrete poured for Scottish wind farm
Construction

First concrete poured for Scottish wind farm

October 22, 2025
Watkins Jones will get inexperienced gentle for 800 houses in Edinburgh | Information
Construction

Watkins Jones will get inexperienced gentle for 800 houses in Edinburgh | Information

October 22, 2025
Next Post

Megaproject Construction Creates Subject matter Shortages in Existence Sciences Building – Newest Heavy Building Apparatus Information

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended.

How A lot Shipment Can Have compatibility in a 40-Foot Container? – Semi Trailers Producer, Semi Vans for Sale

December 22, 2023
Service provider gross sales pick out up once more

Service provider gross sales pick out up once more

September 5, 2025

Newsletter

Categories

  • Bulldozer
  • Construction
  • Construction Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Uncategorized

Recent Posts

  • Night time-Time Set up in Entrance of a German Fairytale Fortress
  • Tadano CC 38.650-1 Gets rid of Rabobank Emblem Signage From Euromast in Rotterdam
  • Sandvik Coromant hosts TechDays 2025 in India

© 2025 All rights reserved by machineryasia.info

No Result
View All Result
  • Home
  • Bulldozer
  • Construction
  • Project Management
  • Heavy Equipment
  • Mini Excavator
  • Skid Steer
  • Shop

© 2025 All rights reserved by machineryasia.info